24 Commercial Tacker 20
This system requires a smooth pose more specialized than an ashlar, but has the advantage of better compacting the screed around the pipe, allowing a better yield compared to an ashlar. The correct execution of laying as in the drawing is guaranteed by the heat-reflecting sheet of polyethylene placed over the panel of extruded polystyrene, on which is printed a grid in step 5
Suitable for capannoncini, workshops or stores no larger than 1000 square meters
The module is provided for the laying step 20 everywhere.
The tube diameter is 20×2 choice PE Xa or PE-RT (both with evoH oxygen barrier).
The distribution can be predicted by the collector or integrated group built a fixed point or climate (material choice polyamide or brass).
Suitable for capannoncini, workshops or stores no larger than 1000 square meters
The module is provided for the laying step 20 everywhere.
The tube diameter is 20×2 choice PE Xa or PE-RT (both with evoH oxygen barrier).
The distribution can be predicted by the collector or integrated group built a fixed point or climate (material choice polyamide or brass).